Affiliation:
1. a School of Water Conservancy and Environment, University of Jinan, Jinan 250022, China
2. b Shandong GEO-Surveying & Mapping Institute, Jinan 250022, China
Abstract
Abstract
The Yellow River diversion project consists of three gates, two pumping stations, and one plain reservoir, with a total river length of 17.46 km in the Panzhuang Yellow River irrigation area, which provides the primary water source for the Dezhou central city, Shandong Province, China. The project is subject to the constraints of the Yellow River diversion sluice diverting water time, reservoir diverting water time, and combinations of pumping stations with self-flowing gates. The opening and closing forms of the gates and pumps are complicated and irregular, and the switching of the gates and pumps mainly depends on the experience of the staff, which makes the water transfer cost high and the water transfer time long. Based on engineering compositions in the study area, an optimal mathematical model is constructed by the dynamic programming method. By combining the flow and water level, the objectives of the minimum operation cost, the shortest water transfer time and the combination of the two are established. A new optimization scheme of the switch between gates and pumps combined with water level and flow is proposed, which reduces the operation cost by 20% and the water transfer time by 8%, providing an efficient operation mode.
Funder
Natural Science Foundation of Shandong Province
Subject
Water Science and Technology
Reference12 articles.
1. One- and three-dimensional coupling flow simulations of pumped-storage power stations with complex long-distance water conveyance pipeline system
2. Optimizing inter-basin water transfers from multiple sources among interconnected river basins;Ma;Journal of Hydrology,2020
3. Reliability analysis of pumping station for sewage network using hybrid neural networks - genetic algorithm and method of moment
4. Enabling improved water and environmental management in an irrigated river basin using multi-agent optimization of reservoir operations;Rohmat;Environmental Modelling & Software,2020
5. Economic impact assessment of middle route of south-to-north water diversion project on water source area in Henan province based on uncertain AHP method;Wang;South-to-North Water Diversion and Water Science & Technology,2011