Affiliation:
1. Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology, Clear Water Bay, Kowloon, Hong Kong, China
Abstract
This paper reports on a pilot trial of a novel MBR developed with coarse-pore membrane module by the authors. The plant was operated for 370 days with up to 7 m3/d raw saline sewage after 3-mm screening. The plant performed successfully without membrane fouling for 270 days except an accidental power source failure for 30 h, during which membrane was fouled under no aeration and mixing condition. EPS increases in both the reactor and the bio-cake on the membrane surface explained this fouling. The average TSS, COD and TKN removal efficiency were 92, 90, and 93%, respectively, under a high effective permeate flux of 4.8 m/d and a low air-to-water ratio of 15.
Subject
Water Science and Technology,Environmental Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献