Abstract
This work was developed in two stages: initially in water hyacinth ponds under batch conditions (pilot-scale) and later in full-scale ponds under a continuous state, so as to determine local parameters for the operation of this kind of pond for piggery wastes treatment. Seasonal variations are important features influencing plant productivity and performance. The water hyacinth ponds were able to remove around 50% of the applied organic loads (COD, BOD, TN, TP), even in case of elevated values (110 kg/ha/day) applied for total nitrogen surface loads. An hydraulic retention time of 20 days was shown to be ideal for the treatment. The utilization of water hyacinths as a complement for the animal diet closes the productive cycle in a sustainable way. The results have demonstrated the feasibility of the proposed treatment system.
Subject
Water Science and Technology,Environmental Engineering
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献