1. Bezopasnost’ gornotransportnogo oborudovaniya, elektroustanovok i elektrooborudovaniya ugol’nykh shakht i razrezov. Ser. 05. Vyp. 9 (Safety of Mining Transport Equipment, Electric Installations, and Electric Equipment of Coal Mines and Open Cuts. Ser. 5, Iss. 9), Moscow: Nauchn.-Tekh. Tsentr po Bezopasnosti v Prom-sti Gosgortekhnadzora Ross., 2003.
2. Olszowiec, P., Insulation Measurement and Supervision in Live AC and DC Unearthed Systems, Lecture Notes in Electrical Engineering, vol. 314, Cham: Springer, 2014. https://doi.org/10.1007/978-3-319-07010-0
3. Malafeev, S.I. and Anuchin, A.V., Control over electrical equipment insulation resistance in main drive gears of mining excavators, Gorn. Zh., 2017, no. 10, pp. 45–48. https://doi.org/10.17580/gzh.2017.10.09
4. Ivanov, E.A., Galka, V.L., and Malayan, K.R., Bezopasnost’ elektroustanovok i sistem avtomatiki (Safety of Electrical Equipment and Automation Systems), St. Petersburg: Elmor, 2003.
5. Malafeev, S.I., Serebrennikov, N.A., and Frolkin, V.G., Analysis of grid with an ac/dc converter in the event of leakage currents to the ground, Russ. Electr. Eng., 2004, vol. 75, no. 12, pp. 12–16.