1. Díez, M.A., Alvarez, R., and Barriocanal, C., Coal for metallurgical coke production: Prediction of coke quality and future requirements for cokemaking, Coal Geol., 2002, no. 50, pp. 389–412.
2. Ozga-Blaschke, U., Gospodarka Weglem Koksowym (Coking Coal Management), Cracow: IGSMiE, 2010.
3. Blaschke, W., Grudzin-ski, Z., Lorenz, U., et al., The origin, form and content of chlorine in black coal, Sci. Papers IGSMiE Pol. Acad. Sci., 2010, vol. 77, pp. 23–33.
4. Osmólski, The role of the equalization tank in industrial wastewater treatment at Przyjaz-ncokemaking plant, Coke Mag., 2013, vol. 10(20), pp. 4–5.
5. Tatara, M., Tatara, A., Hummer, W., and Komosin-ski, B., The method of wet coke quenching: Current state and development perspectives in reference to BAT requirement change, Conference Materials: Koksownictwo 2010, Zakopane, 2010.