1. Rymov, V.A., Polukhin, P.I., and Potapov, I.N., Sovershenstvovanie proizvodstva svarnykh trub (Improving the Production of Welded Pipes), Moscow: Metallurgiya, 1983.
2. Matveev, Yu.M. and Vatkin, Ya.L., Kalibrovka instrumenta trubnykh stanov (Alignment of Tool for Pipe Mills), Moscow: Metallurgiya, 1970.
3. Zhukovskii, B.D., Zil’bershtein, L.I., and Furmanov, V.B., Proizvodstvo trub (Pipe Production), Moscow: Metallurgiya, 1970.
4. Samusev, S.V., Zhigulev, G.P., Fadeev, V.A., and Manakhov, K.S., Shaping of pipe blanks on specialized bending equipment, Steel Transl., 2016, vol. 46, no. 3, pp. 169–172.
5. Samusev, S.V., Aleshchenko, A.S., and Fadeev, V.A., Simulation of the process of continuous forming of straight-seam welded pipes on the basis of Tesa 10-50 trainer, Izv. Vyssh. Uchebn. Zaved., Chern.
Metall., 2018, vol. 61, no. 5, pp. 378–384.