1. Elektrotekhnicheskaya entsiklopediya (Electrotechnical Encyclopedia), Moscow: MEI, 2005, vol. 1.
2. Labunets, I.A., Asynchronized Turbogenerators. Quality Voltage Control, Novosti elektrotekhniki, 2007, no. 1(43), pp. 1–9.
3. Pinchuk, N.D., Kadi-Ogly, I.A., and Sidel’nikov, A.V., New Ways in Manufacturing of Electric Machines with Double Power Supply System by Using the Asynchronous Control Principle, Vesti v Elektrotekhnike, 2005, no. 1, pp. 43–48.
4. Kadi-Ogly, I.A. and Sidel’nikov, A.V., Asynchronized Turbogenerators with Air Cooling, in Problemy sozdaniya i ekspluatatsii novykh tipov elektroenergeticheskogo oborudovaniya (Design and Exploitation Problems of New Types of Electroenergetic Equipment), St.Petersburg: OEEP RAN, 2004, issue 6, pp. 8–21.
5. Zinakov, V.E., Experience of Industry Operation of Asynchronized Turbogenerator TZFA-110 Prototype Model at Heat Electropower Station-22 of OAOMosenergo, Vesti v elekrtoenergetike, 2005, no. 1, pp. 39–42.