1. Abramov, D.V., Dorozhkov, V.V., and Koneshov, V.N., Key elements of construction and exploitation of a landbased seismic-gravimetric complex, Seism. Instrum., 2011, vol. 47, no. 3, pp. 253–258.
2. Clark, A., Analysis,measurement and modelling of Jitter, in ITU-T Delayed Contribution, Geneva, Switzerland, 2003, International Telecommunication Union, 2003, pap. no. COM12 - D98 - E.
3. Galaganov, O.N., Guseva, T.V., Krupennikova, I.S., and Perederin, V.P., GNSS measurements in Northeast Asia, Geofiz. Issled., 2015, vol. 16, no. 1, pp. 5–13.
4. Ilyukhin, A.A. and Koneshov, V.N., Estimation of effectiveness of the DGPS positioning method under the conditions of geophysical observatory, Perspektivnye tekhnologii v sredstvakh peredachi informatsii (Perspective Technologies in Transmission Systems), Vladimir–Souzdal, Russia, 2013, Vladimir: Vladimir. Gos. Univ. im. A.G. i N.G. Stoletovykh, 2013, pp. 130–132.
5. Ilyukhin, A.A. and Koneshov, V.N., Experimental assessment of GPS positioning abilities under the conditions of geophysical observatory, Trudy XIMezhdunarodnoi nauchnoi konferentsii “Fizika i radioelektronika v meditsine i ekologii” (Proceedings of the XIInternational Scientific Conference “Physics and Radioelectronics in Medicine and Ecology”), Vladimir, Russia, 2014, Vladimir: Vladimir. Gos. Univ. im. A.G. i N.G. Stoletovykh, 2014a, pp. 124–127.