1. Malindžak, D. and Gazda, A., The principles and specifics of logistics of metallurgical production, Metal, 2011, no. 5, pp. 18–20.
2. Jovanovic, J.R., Milanovic, D.D., and Radisav, D., Manufacturing cycle time analysis and scheduling to optimize its duration, J. Mech. Eng., 2013, vol. 60, nos. 7–8, pp. 512–524.
3. Maslo, A.V., Analysis of duration of production cycle of packaging products, Izv. Vyssh. Uchebn. Zaved., Probl. Poligrafii Izd. Dela, 2009, no. 4, pp. 91–100.
4. Duan, G., Chen, L., Li, Y.-Z., Song, J.-Y., and Akhtar, T., Optimization on production-inventory problem with multistage and varying demand, J. Appl. Math., 2012, vol. 2012, no. 10, pp. 1–16.
5. Geraskin, M.I. and Egorova, V.V., The algorithm for dynamic optimization of the production cycle in bearing industry, Inf. Technol. Nanotechnol., 2016, vol. 1638, pp. 552–568.