Analisis Waktu dan Biaya dengan Metode Crash Duration pada Keterlambatan Proyek Pembangunan Jembatan Sei Hanyu Kabupaten Kapuas

Author:

Oetomo Wateno,Priyoto Priyoto,Uhad Uhad

Abstract

In analyzing the comparison of the cost of acceleration with the acceleration time used by the method Time Cost Trade Off. The analysis is done by using / shortening (crashing) time of implementation by using an alternative to increase working hours (overtime) for 3 hours. With apply the TCTO analysis, the implementation of the construction of the Sei Hanyu Bridge project after its duration performed calculations using the crash duration method, it was found that the time needed to accelerate the construction of the Sei Hanyu Bridge in Kapuas Regency for 1038 calendar days(148 weeks), can be accelerated 44 days from the original planning 1082 calendar days (155 weeks). With the acceleration of the completion of the construction of the Sei Hanyu bridge in Kapuas Regency, an additional fee of Rp. 175,160,710.43 is required with an additional cost (cost slope) of Rp 3,980,925.24 per day for 44 days, so the optimal costs needed to accelerate the construction of the Sei Hanyu bridge in Kapuas Regency was Rp. 45,102,729,928.11 originally planned for Rp.44,927,569,217.68

Publisher

Universitas Muhammadiyah Palangkaraya

Subject

General Medicine

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3