Incentive modeling analysis in engineering applications and projects with stochastic duration time

Author:

Zhao J.,Su J.F.

Abstract

Incentives are quite common to be utilized in engineering applications such as some infrastructure development projects or construction projects. Due to the increasing complexity of construction management and the continuing trend towards outsourcing of component or engineering outsourcing activities, we focus on the issue of incentive design. Time collaboration is one of the main focuses of random project duration time in parallel projects. In this article, we consider a setting where a manufacturer outsources two parallel subtasks to two different suppliers, and the manufacturer is time sensitive. On the premise that the project completion time follows the exponential distribution, some models are established to compare the proposed incentives and we get the comparative analysis of the proposed incentives. This paper puts forward three kinds of time-based incentive mechanisms, namely, deadline incentive mechanism, competition mechanism and mixed incentive mechanism. We do modeling analysis for all incentive mechanisms. We get the optimal work rates determined by suppliers and compare various incentive mechanisms to maximize manufacturers' profits.

Publisher

Production Engineering Institute (PEI), Faculty of Mechanical Engineering

Subject

Management of Technology and Innovation,Industrial and Manufacturing Engineering,Management Science and Operations Research,Mechanical Engineering,Nuclear and High Energy Physics

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3