1. Bertsekas, D.P. and Tsitsiklis, J.N. (2008). Introduction to Probability, 2nd Edition. Athena Scientific.
2. Automatic transfer lines with buffer stocks;Buzacott;International Journal of Production Research,1967
3. Gershwin, S.B. (1994). Manufacturing Systems Engineering. Prentice-Hall.
4. Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended petri net;Kim;IEEE Transactions on Automation Science and Engineering,2008
5. Scheduling analysis of time-constrained dual-armed cluster tools;Kim;IEEE Transactions on Semiconductor Manufacturing,2003