1. Angius, A., Horvath, A., and Colledani, M. (2011). Moments of cumulated output and completion time of unreliable general markovian machines. In Proceeding of the 18th World Congress of the International Federation of Automatic Control (IFAC).
2. On the variance of the production output of transfer lines;Ciprut;Robotics and Automation, IEEE Transactions on,1999
3. Analysis of the production variability in multi-stage manufacturing systems;Colledani;CIRP Annals - Manufacturing Technology,2010
4. Gershwin, S.B. (1993). Variance of the output of a tandem production system. In R.D. Onvural and I.F. Akyildiz (eds.), Proceedings of the Second International Conference on Queuing Networks with Finite Capacity.
5. Gershwin, S.B. (1994). Manufacturing Systems Engineering. PTR Prentice Hall.