1. Cardin O., P. Castagna (2005), Defining A Command Architecture Enabling Proactive Simulations On A Complex Manufacturing System, in Proceedings of the I3M Conceptual Modeling and Simulation Conference CMS'2005, Marseille, France.
2. Castagna P., N. Mebarki, R. Gauduel, (2001), Apport de la simulation comme outil d'aide au pilotage des systèmes de production - exemples d'application, in Proceedings of the 3e Conférence Francophone de MOdélisation et SIMulation MOSIM'01, Troyes, France.
3. Eventtriggered environment for verification of real-time system;Cofer,2003
4. A backward approach in list scheduling algorithms for multi-machine tardiness problems;Kim;Computers and operations research,1995
5. Kindler E., I. Krivy and A. Tanguy, (2001). Tentative de simulation réflective des systèmes de production et logistiques, in Proceedings of the 3e Conférence Francophone de MOdélisation et SIMulation MOSIM'01, Troyes, France, Volume 1, pp. 427-434.