1. Scheduling under resource constraints – deterministic models;Blazewicz,1986
2. J. Carlier. Problemes d'ordonnancements à contraintes de ressources: Algorithmes et complexité. Doctorat d'état, 1984.
3. The project scheduling problem with production and consumption of resources: A list-scheduling based algorithm;Carlier;Discrete Applied Mathematics,2009
4. S. Carrera, M.C. Portmann, and W. Ramdane Cherif. Outils d'aide à la decision pour le lissage de charges des plateformes logistiques. Congrès International de Génie Industriel 2009. 8p. 10–12 juin, Tarbes-France.
5. Preemptive scheduling with staircase and piecewise linear resource availability;Cochand;Methods and Models of Operations Research,1989