Author:
Cheng Ming,Sarin Subhash C.
Reference16 articles.
1. Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage;Carpov;Computers and Operations Research,2012
2. Cheng, M. and Sarin, S.C. (2012). Two-stage, single-lot, lot streaming problem for a 1+2 hybrid flow shop. Research Report.
3. Two-stage, hybrid flowshop scheduling problem;Gupta;The Journal of the Operational Research Society,1988
4. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage;Gupta;International Journal of Production Research,1991
5. Scheduling a two-stage hybrid flowshop with separable setup and removal times;Gupta;European Journal of Operational Research,1994
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献