1. Dyba, M., and Derkowski, W., “Bond Stresses between Concrete and Prestressing in Pre-tensioned Elements: State of the Art,” Cement, Lime, Concrete, V. 83, No. 5, 2018, pp. 358-368.
2. Behaviour of End Zone of Pre-tensioned Concrete Elements;Derkowski;Procedia Engineering,2017
3. Assessing Historical Provisions for Bond of Plain Bars;Feldman;ACI Structural Journal,2017
4. Fabbrocino, G.; Verderame, G. M.; Manfredi, G.; and Cosenza, E., “Experimental Response and Behavioral Modelling of Anchored Smooth Bars in Existing RC Frames,” Proceedings of the International Conference on Bond in Concrete, Budapest, Hungary, 2002, pp. 111-118.
5. Abrams, D. A., “Tests of Bond between Concrete and Steel,” Bulletin No. 71, Engineering Experiment Station, University of Illinois Urbana-Champaign, Urbana, IL, Dec. 1913, 240 pp.