Author:
Varela Maria L.R.,Trojanowska Justyna,Carmo-Silva Silvio,Costa Natalia M.L.,Machado Jose
Abstract
AbstractScheduling is one of the most important decisions in production control. An approach is proposed for supporting users to solve scheduling problems, by choosing the combination of physical manufacturing system configuration and the material handling system settings. The approach considers two alternative manufacturing scheduling configurations in a two stage product oriented manufacturing system, exploring the hybrid flow shop (HFS) and the parallel flow shop (PFS) environments. For illustrating the application of the proposed approach an industrial case from the automotive components industry is studied. The main aim of this research to compare results of study of production scheduling in the hybrid and the parallel flow, taking into account the makespan minimization criterion. Thus the HFS and the PFS performance is compared and analyzed, mainly in terms of the makespan, as the transportation times vary. The study shows that the performance HFS is clearly better when the work stations’ processing times are unbalanced, either in nature or as a consequence of the addition of transport times just to one of the work station processing time but loses advantage, becoming worse than the performance of the PFS configuration when the work stations’ processing times are balanced, either in nature or as a consequence of the addition of transport times added on the work stations’ processing times. This means that physical layout configurations along with the way transport time are including the work stations’ processing times should be carefully taken into consideration due to its influence on the performance reached by both HFS and PFS configurations.
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Organizational Behavior and Human Resource Management,Management Science and Operations Research,Business and International Management
Reference49 articles.
1. The hybrid flow shop scheduling problem of;Ruiz;European Journal Operational Research,2010
2. Single machine group scheduling with resource dependent setup and processing times of;Janiak;European Journal Operational Research,2005
3. Web - based Technologies Integration for Distributed Manufacturing Scheduling in a Virtual Enterprise of Web Portals;Varela;International Journal,2012
4. Optimal scheduling of a two - stage hybrid flow shop of;Haouari;Mathematical Methods Operations Research,2006
5. Job shop scheduling heuristics and frequency of scheduling of;Muhlemann;International Journal Production Research,1982
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献