Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes

Author:

Al Kulabi Ahmed Kamil1,Atiea Huda M. Jawad2

Affiliation:

1. Department of Civil Engineering, Faculty of Engineering, University of Kufa , Najaf, 54001 , Iraq

2. Department of Environmental Planning, Faculty of Physical Planning, University of Kufa , Najaf, 54001 , Iraq

Abstract

Abstract In the construction industry, time overrun in construction projects has become a global phenomenon. In Iraq, this problem is very considerable where a high percentage of projects are completed behind schedule, causing a large negative impact on society on the one side and the economic impact on the other side of the country. This study aims to define the major factors that cause construction project’s time overrun by studying delay causes of projects and performing a number of interviews with a group of specialists in project construction. Next, a questionnaire is used to obtain responses from 115 participants in the city of Najaf. In addition, agreement analysis is performed to ensure that the arranged rankings by all involved respondents’ categories are not ordered by coincidence, and the Chi-squared test is put to use as well to mark the agreement or disagreement context among the respondent category rankings. The target respondents of the study included: clients, consultants, project managers, contractors, and engineers who have an experience in project management and construction. The findings of the study revealed that the top five most essential factors causing delay in public construction projects are global and local economic crises, bureaucracy and corruption, public holidays, delay in getting governmental permits, and issuing numerous change orders by owners. Moreover, eight components are extracted from the 45 questionnaire items put to use for factor analysis. Among the extracted factors are the inaccuracy of tendering process, technical performance management, and government interferences.

Publisher

Walter de Gruyter GmbH

Subject

Electrical and Electronic Engineering,Mechanical Engineering,Aerospace Engineering,General Materials Science,Civil and Structural Engineering,Environmental Engineering

Reference39 articles.

1. Bramble BB, Callahan MT. Construction delay claims. USA: John Wiley and Sons, Inc.; 1987.

2. Aibinu AA, Jagboro GO. The effects of construction delays in Nigerian construction industry. Int J Project Manag. 2002;20(8):593–9.

3. Assaf SA, Al-Hejji S. Causes of delay in large construction projects. Int J Project Management. 2006;24(4):349–57.

4. Bekr GA. Causes of delay in PCPs in Iraq. Jordan J Civil Eng. 2015;9(2):149–62.

5. Singh R. Delays and cost overruns in infrastructure project: extent causes and remedies. Econ Political Weekly. 2010;XLV(21):43–54.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3