Estimation of Sport Facilities by Means of Technical-Economic Indicator

Author:

Hanak Tomas1,Hrstka Lukas1,Tuscher Martin1,Biolek Vojtech1

Affiliation:

1. Brno University of TechnologyBrno, Czech Republic

Abstract

AbstractThis paper is concerned with early cost estimation of sport facilities. Sufficiently precise cost estimation is essential for investors in the pre-investment stage where they decide on whether to pursue an investment and choose a suitable technical solution for the development of the project. Through a detailed analysis of the technical and economic documentation pertaining to seven sport facilities projects assembled using concrete prefabricated beam parts, as well as evaluation of the data thus obtained, three types of technical-economic indicators were set in relation to the enclosed building area, the number of spectator seats and the sports playing area. The results achieved indicate that evaluation of relations between these three indicators could contribute to a more effective use of investment funding on the part of the investor. Other conclusions include the finding that available indicators published by private companies active in the area of construction budgeting are not sufficiently accurate for the purposes of investment decision-making; specifically, these indicators greatly overestimate the costs of sport facilities, which can potentially lead to these projects being rejected. This contribution brings know-how for a more accurate early cost estimation of sport facilities in the Czech Republic which can, thanks to a generally applicable methodology, be used in other countries as well.

Publisher

Walter de Gruyter GmbH

Subject

Electrical and Electronic Engineering,Mechanical Engineering,Aerospace Engineering,General Materials Science,Civil and Structural Engineering,Environmental Engineering

Reference24 articles.

1. Estimating the value of public construction works in Poland and the Czech Republic;Scientific Review Engineering and Environmental Sciences,2016

2. Assessment of Large-Scale Projects Based on CBA;Procedia Comput Sci,2015

3. Usage analysis of the information systems for valuation of the construction output;Advances and Trends in Engineering Sciences and Technologies III - Proceedings of the 3rd International Conference on Engineering Sciences and Technologies;,2019

4. Aggregated technical and economic indicators and facilities coefficient in the building industry;Slovak Journal of Civil Engineering,2012

5. Sport Facility Operations Management;Chapter 3 - Financing sport facilities. 1st ed. Taylor & Francis;,2010

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Early Fast Cost Estimates of Sewerage Projects Construction Costs Based on Ensembles of Neural Networks;Applied Sciences;2023-11-28

2. Simulation of a Sports Body Index Monitoring System Based on Internet of Things Technology;Proceedings of the 4th International Conference on Big Data Analytics for Cyber-Physical System in Smart City - Volume 1;2023

3. Performance Management in Czech Construction;Tehnički glasnik;2022-02-04

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3