Affiliation:
1. 1Faculty of Engineering, Civil Engineering Department, Suleyman Demirel University, 32260 Isparta, Turkey
2. 2Faculty of Engineering and Natural Sciences, Civil Engineering Department, Science and Technology University, 01180 Adana, Turkey
Abstract
AbstractThe use of resources is increasing due to continuous increase in world population and rapid industrialization, while natural resources are being exhausted day by day. Usage of waste materials or by-products in highway construction has substantial environmental and economic benefits. In this study, the usage of cullet and waste glass bottle dust as mineral filler material in hot mix asphalt as an alternate to traditional crushed stone dust was investigated. Optimum bitumen content was determined by the Marshall mix design method by using six different bitumen contents (4.0%, 4.5%, 5.0%, 5.5%, 6.0%, and 6.5%). With the optimum bitumen content, three different mineral filler types (cullet, glass bottle waste, and stone dust) and six different filler ratios (4%, 5%, 6%, 7%, 8%, and 9%) were used to prepare asphalt mixture samples. Samples were performed using the Marshall stability test, and the results were compared. It is concluded that cullet and glass bottle waste can be used in asphalt mixtures as a mineral filler alternate to crushed stone dust if the economic and environmental factors favor it.
Subject
Materials Chemistry,Ceramics and Composites
Reference42 articles.
1. Test Method for Specific Gravity and Adsorption of Mineral Annual Book of ASTM Standards;ASTM;USA,1992
2. Examination of Marshall sample s properties prepared using Portland cement nd National Asphalt;Acar;Symposium,1998
3. Utilization of industrial waste materials in highway construction Thesis Technical University Turkey;Çağlar,2007
4. Roads;Flynn,1993
5. Test Method for Specific Gravity and Adsorption of Fine Aggregate Annual Book of ASTM Standards;ASTM;USA,1992
Cited by
36 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献