Author:
Młyński Dariusz,Chmielowski Krzysztof,Młyńska Anna
Abstract
Abstract
The paper presents an analysis of hydraulic load in a wastewater treatment plant (WTP) in Jasło. The study was based on the records of daily sewage volume entering the treatment plant within a multi-year period of 2010–2014. The analysis took into account the average daily amount of incoming sewage, the maximum daily peaking factor for the incoming sewage, changes in the sewage volume depending on specific month and day of a week, and class intervals with the greatest frequency of occurrence.
The analysis revealed that the average daily volume of the sewage entering the WTP in Jasło in the investigated multi-year period was 13 045 m3·d−1. The amount of incoming sewage was variable, as evidenced by the maximum peaking factors of daily sewage inflow that ranged from 1.07 to 2.78, depending on a specific month. The sewage admission was the largest in March, May and June and on Saturdays. Sewage volume interval most often occurring at the WTP in Jasło was the one between 8 000 and 10 000 m3·d−1. The study results indicated that the facility was hydraulically underloaded.
Subject
Agricultural and Biological Sciences (miscellaneous),Water Science and Technology,Development,Geography, Planning and Development,Environmental Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献