Construction Scheduling and Stability of the Resulting Schedules

Author:

Krzemiński M.1

Affiliation:

1. 1Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, Poland

Abstract

Abstract The paper present the concept of stability assessing the of solutions which are construction schedules. Rank have been obtained through the use of task scheduling rules and the application of the KASS software. The aim of the work is the choice of the equivalent solution in terms of the total time of the project. The selected solution optimization task should be characterized by the highest resistance to harmful environmental risk factors. To asses the stability of schedule simulation technique was used.

Publisher

Walter de Gruyter GmbH

Subject

Civil and Structural Engineering

Reference6 articles.

1. Technology selection for construction project with the use of fuzzy preference relation of Civil vol is pp;Ibadov;Archives Engineering,2015

2. Analysis of the partnering relations of Polish Slovak and Ukrainian construction enterprises Technological and of Vol No pp;Radziszewska;Economic Development Economy,2010

3. Computer - aided decision - making in construction project development of Civil Engineering and vol is pp;Książek;Journal Management,2015

4. Fuzzy control of the partnering relations of a construction enterprise of Civil Engineering and Vol No pp;Radziszewska;Journal Management,2011

5. Controlling partnering relations in construction operations using fuzzy reasoning of Civil vol is pp;Radziszewska;Archives Engineering,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3