Author:
Fanucchi Rodrigo Z.,Bessani Michel,Camillo Marcos H. M.,Soares Anderson da S.,London João B. A.,Darwin Willian,Maciel Carlos D.
Abstract
Abstract
This paper proposes a methodology to repair crews dispatch during distribution feeders restoration immediately after remotely controlled actions have been taken. Our method determines the sectors patrol sequence using the expected number of faults for each sector considering a previously calculated fault probability. Next, a road graph mapping of the buses is obtained by associating each bus with its real-world position. The crews’ route inside each sector is determined by the application of the nearest neighbor algorithm on that mapping. The case studies analyzed 24 real faults available in the database of a Brazilian power distribution company, and, a comparison was made between the time spent to locate the failures by simulating both the proposed methodology and the usual greedy strategy. The average time spent in localizing all the failures was from 9.49 % to 41.81 % shorter than in the usual method. Moreover, the speed and distance of repair crews showed weak influence in the crew dispatch methodology efficiency. Such results indicate an enhancement of the power distribution QoS indicators by using the proposed methodology to deal with faults.
Subject
Energy Engineering and Power Technology
Reference68 articles.
1. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona;Reliab Eng Syst Saf,2012
2. Technical challenges for electric power industries with implementation of distribution system automation in smart grids;Renewable Sustainable Energy Rev,2015
3. Assessing the potential of MV automation for distribution network reliability improvement;Int Trans Electr Energy Syst,2017
4. Isolation, and Service Restoration in Distribution Systems: State-of-the-art and Future Trends;IEEE Trans Smart Grid,2016
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献