Balance of Cost, Time, and Quality Related to Construction Projects Regarding the Reinforced Concrete of Underground Structures using a Meta-Heuristic Algorithm

Author:

Hosseini S. A.1,Akbarpour A.2,Ahmadi H.3,Aminnejad B.3

Affiliation:

1. PhD candidate of Civil engineering, Roudehen branch, Islamic Azad University, Roudehen, Iran

2. PhD., Islamic Azad University, South Tehran Branch, Department of Civil Engineering, Tehran, Iran

3. PhD., Islamic Azad University, Roudehen Branch, Department of Civil Engineering, Roudehen, Iran

Abstract

AbstractUnderground spaces having features such as stability, resistance, and being undetected can play a key role in reducing vulnerability by relocating infrastructures and manpower. In recent years, the competitive business environment and limited resources have mostly focused on the importance of project management in order to achieve its objectives. In this research, in order to find the best balance among cost, time, and quality related to construction projects using reinforced concrete in underground structures, a multi-objective mathematical model is proposed. Several executive approaches have been considered for project activities and these approaches are analyzed via several factors. It is assumed that cost, time, and quality of activities in every defined approach can vary between compact and normal values, and the goal is to find the best execution for activities, achieving minimum cost and the maximum quality for the project. To solve the proposed multi-objective model, the genetic algorithm NSGA-II is used.

Publisher

Walter de Gruyter GmbH

Subject

Civil and Structural Engineering

Reference46 articles.

1. non - computer approach to the critical path method for the construction industry;Fondahl,1962

2. Multi objective optimization of time cost cost quantity using multi colony ant algorithm of Contemporary Mathematical;Shrivastava;International Journal Sciences,2012

3. Schedule compression using the direct stiffness method;Moselhi;Canadian Journal of Civil Engineering,1993

4. Critical path planning scheduling Mathematical basis;Kelley;Operations research,1961

5. defensive culture ed;Nouroozi;security,2006

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3