1. Neidel, A.: Metallurgical Failure Investigation of Small Bore Piping (SBP) on Diesel Hydrotreating Unit (DHT). Internal report BLN MT/2023/0118. Berlin, April 28, 2023.
2. Eng. M. Hassan: Metallurgical Tests for Defected ¾” SBP on 14”-P-140403-N1G9F-H and 1”-P-140406 (PG-0029A). Laboratory order received on March 7, 2023.
3. Material Selection Study (MSS): Service Compatibility for Material of DHT Reactor Effluent Exchangers up to DHT Separator D-1405. ERC study, received March 15, 2023.
4. Root Cause Analysis Report: For Failure of Dht Small Bore Piping (14-PT-0021 & Vent/Drain on 14”-P-140403-N1G9F-H). ERC/EPROM, issued March 23, 2022.
5. Dr. Eng. Hamed Ahmed Abdel-Aleem: Microstructure, Microhardness evaluations measurements and Deposit analysis by XRD for Leaked ¾” and 1” branch connection pipe on line 14”-P-140403-N1G9F-H. Central Metallurgical R & D Institute (CMRDI), Cairo, Egypt, February 27, 2022.