Affiliation:
1. Institute of Hydro-Engineering, Polish Academy of Sciences, Kościerska 7, 80-328 Gdańsk, Poland
Abstract
Abstract
This paper presents and discusses the results of numerical modelling of pore water pressure build-up in post-flotation saturated tailings deposited at the Tailings Storage Facility “Żelazny Most”, caused by seismic-induced dynamic loading. Numerical simulations were based on the compaction/liquefaction model proposed by A. Sawicki. The model parameters were determined in the laboratory for tailings sampled at the TSF “Żelazny Most”. The sensitivity of the numerical model was verified in a series of numerical tests for various horizontal acceleration amplitudes. In the main calculations, an accelerogram recorded during a real paraseimic event was assumed. The results obtained show that, with the current seismic activity near the TSF “Żelazny Most”, some pore water pressure is generated within the saturated tailings layer, but it does not trigger the liquefaction phenomenon.
Subject
Water Science and Technology,Civil and Structural Engineering
Reference17 articles.
1. Arias A. (1970) A measure of earthquake intensity, [in:] R. J. Hansen (ed), Seismic Design for Nuclear Power Plants, The M.I.T. Press, 438–483.
2. Boulanger R.W. and Idriss I. M. (2006) Liquefaction susceptibility criteria for silts and clays, J. Geotech. and Geoenvir. Engrg., ASCE, 132 (11), 1413–1426.10.1061/(ASCE)1090-0241(2006)132:11(1413)
3. Dyvic R. and Madhus C. (1985) ‘Measurements of Gmax using bender elements, Civil Engrs Convention, Detroit, New York, American Society of Civil Engineers, 1985, 186–196.
4. PIANC (2001) Seismic Design Guidelines for Port Structures, Lisse/Abingdon/Exton (Pa)/Tokyo, Balkema.
5. Przewłócki J., Knabe W. (1995) Settlement of a soil stratum subjected to an earthquake, Int. Jnl. for Numerical and Analytical Methods in Geomechanics, 19, 813–821.10.1002/nag.1610191105
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献