Author:
Rahimi Esmaeil,Oraee Kazem,Shafahi Zia Aldin,Ghasemzadeh Hasan
Abstract
Abstract
Optimum cut-off grades determination in mining life affects production planning and ultimate pit limit and it is also important from social, economical and environmental aspects. Calculation of optimum cut-off grades has been less considered for mines containing various mineral processing methods. In this paper, an optimization technique is applied to obtain optimum cut-off grades for both concentration and heap leaching processes. In this technique, production costs and different recoveries of heap leaching method directed into modeling different annual cash flows in copper mines. Considering the governing constraints, the Lagrange multiplier method is practiced to optimize the cut-off grades in which the objective function is supposed to maximize Net Present Value. The results indicate the effect of heap leaching process on the optimum cut-off grades of primary and secondary sulfide deposits.
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献