Hashemi Ali Saadatmand,Sattarvand Javad
Abstract
Abstract
Using simulation modeling, different management systems of the open pit mining equipment including non-dispatching, dispatching and blending solutions have been studied for the Sungun copper mine. Developed model has the capability of considering detailed features of both loading and hauling equipment. Productivity assessment scenarios have been established on the constructed model and the outputs revealed the noteworthy impact of the match factor of the trucks to the loaders on the production rate by over 40%. A dispatching simulation model with the objective function of minimizing truck waiting times have been developed and 7.8% improvement obtained by applying a flexible assignment of the trucks for the loaders compared to the fixed assignment system. Finally ore grade blending control unit has been introduced into the model. Getting the advantages of the newly added module it became possible to monitor the portion of material excavated from different operating benches and control truck dispatching rules for keeping the overall ore grade exactly at desired value.
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献