Author:
Li Guanqing,Huang Shengxiang
Abstract
AbstractThe immersed tunnel which is composed of elements has drawn more attention nowadays because of new advancements and developments. The elements are prefabricated somewhere else and floated to the tunnel site to be sunk into the prepared trench. Each element must line up exactly for the watertight gaskets to seal properly. The HZM immersed tunnel, a key part of the Hong Kong-Zhuhai-Macao Bridge (HZMB) that crosses the Pearl River Estuary and links Hong Kong to the east, and Zhuhai and Macao to the west, is 6.7 km long, one of the longest immersed tunnel ever realized in the world. For the construction of such a mega immersed tunnel, particular care should be taken in the perspective of geodetic control. This paper described the design and implementation of the geodetic basis and hierarchical surface control networks. And to decrease the influence of lateral refraction and to improve the configuration strength and increase the number of redundant observation compared with traverse, the design of underground surveying network named duo-linear joint chain and the results of gyro checks are presented. In the end HZM immersed tunnel surveying data is analyzed and the performance of the control networks is demonstrated.
Funder
National Natural Science Foundation of China
Subject
Earth and Planetary Sciences (miscellaneous),Engineering (miscellaneous),Modelling and Simulation
Reference34 articles.
1. Application and state of the art of immersed tube tunnels;Modern Tunnelling Technology,2007
2. Lateral refraction in tunnels;Survey Review,1991
3. Control surveys and setting out for the Channel Tunnel, 3rd UK National Land Surveying and Mapping Conference and Exhibition. Warwick;Engineering,1989
4. Surface and underground geodetic control for superconducting super collider;Journal of surveying engineering,1995
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献