Comparing three scheduling methods using BIM models in the Last Planner System

Author:

Brioso Xavier1,Murguia Danny2,Urbina Alonso3

Affiliation:

1. Construction Management & Technology Reserarch Group (GETEC) , Pontifical Catholic University of Peru , Av. Universitaria 1801, Lima 32, Peru

2. Pontificia Universidad Catolica del Peru

3. Pontificia Universidad Católica del Perú

Abstract

Abstract This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs) using building information modeling (BIM) models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published in Procedia Engineering (Vol. 196, 2017, pages 666–673). A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the structural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach production system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navisworks 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weaknesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simulations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.

Publisher

Walter de Gruyter GmbH

Subject

Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering

Reference21 articles.

1. Agrama, F. A. E. M. (2011). Linear projects scheduling using spreadsheets features. Alexandria Engineering Journal, 50(2), pp. 179–185.

2. Ballard, G. (2000). The last planner system of production control, Thesis. The University of Birmingham.

3. Ballard, G., & Tommelein, I. (2016). Current process benchmark for the last planner system. Lean Construction Journal, 2016 Issue, pp. 57–89.

4. Bokor, O., & Hajdu, M. (2015). Investigation of critical activities in a network with point-to-point relations. Procedia Engineering, 123, pp. 198–207.

5. Brioso, X. (2011). Applying Lean Construction to Loss Control. School of Civil Engineering, Engineering Department, Pontifical Catholic University of Peru, Lima, pp. 1–11.

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3