This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs) using building information modeling (BIM) models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published in Procedia Engineering (Vol. 196, 2017, pages 666–673). A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the structural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach production system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navisworks 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weaknesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simulations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.
Subject
Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering
Reference21 articles.
1. Agrama, F. A. E. M. (2011). Linear projects scheduling using spreadsheets features. Alexandria Engineering Journal, 50(2), pp. 179–185.
2. Ballard, G. (2000). The last planner system of production control, Thesis. The University of Birmingham.
3. Ballard, G., & Tommelein, I. (2016). Current process benchmark for the last planner system. Lean Construction Journal, 2016 Issue, pp. 57–89.
4. Bokor, O., & Hajdu, M. (2015). Investigation of critical activities in a network with point-to-point relations. Procedia Engineering, 123, pp. 198–207.
5. Brioso, X. (2011). Applying Lean Construction to Loss Control. School of Civil Engineering, Engineering Department, Pontifical Catholic University of Peru, Lima, pp. 1–11.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献