Affiliation:
1. Shangqiu University , Kaifeng 475000 , China
2. China Construction 4th Engineering Bureau 6th Corp. Ltd. , Shanghai 201199 , China
Abstract
Abstract
Based on the theoretical model of a soil plug column, the stress analysis of the soil plug column during the spinning process of steel casing is carried out, and the critical depth of the soil column is determined using the stress and torsional shear ratio of the soil column. The effect of factors such as casing wall thickness, surface load, and steel casing spinning speed on the critical depth of soil columns has been explored, and more reasonable construction process parameters have been obtained quantitatively. Combined with the construction of small net distance test piles at a distance of 2.5 m from the tunnel, the impact of the construction process on the existing shield tunnel has been explored. The results indicate that during the construction process, when the wall thickness of the steel casing does not exceed 0.012 m, the surface load does not exceed 15 kPa, the spinning speed of the steel casing is maintained at 5/4/2/4 m/h or 5/3/2/3 m/h (corresponding to soil depths of 2.5/9.5/6/14 m), and the soil height of the soil column is controlled within 11 m, it is not easy to generate soil plug inside the steel casing, and the soil column has strong torsional shear resistance. According to the measured data of adjacent tunnels, it has been found that the construction method of fully rotating steel casing bored pile can effectively reduce the impact on adjacent shield tunnels, and has a good microdisturbance effect, which can control tunnel deformation not exceeding 1 mm and maintain within the warning value range.
Reference29 articles.
1. Song F, Wang B, Huang D, Zhang C, Li P. Influence of construction sequence of cast-in-place group piles with steel sleeve on tunnels. Rock Soil Mech. 2012;33(8):2330–6. 10.3969/j.issn.1000-7598.2012.08.015.
2. Wang Y, Liu J, Guo P, Zhang W, Lin H, Zhao Y, et al. Simplified analytical solutions for tunnel settlement induced by axially loading single pile and pile group. J Eng Mech. 2021;147(12):04021116. 10.1061/(ASCE)EM.1943-7889.0002035.
3. Zhang X, Ding Z, Wang Z, Xia T. Transverse deformations and internal forces of tunnel segments caused by construction of steel casings of bridge piles. Chin J Geotech Eng. 2022;44(11):2052–62. 10.11779/CJGE202211011.
4. Ding Z, Zhang X, Zhang M, Dong Y, Liu K, Xia N. Computational research on longitudinal deformation of subway tunnels caused by steel casing construction of bridge piles. Chin J Rock Mech Eng. 2022;41(4):835–48. 10.13722/j.cnki.jrme.2021.0405.
5. Kong SM, Oh DW, Lee SW, Kim CY, Lee YJ. Effects of pile installation on existing tunnels using model test and numerical analysis with medium density sand. Appl Sci. 2021;11(15):6904. 10.3390/app11156904.