Author:
Bożejko Wojciech,Pempera Jarosław,Wodecki Mieczysław
Abstract
Abstract
In this paper there is considered a flexible job shop problem of operations scheduling. The new, very fast method of determination of cycle time is presented. In the design of heuristic algorithm there was the neighborhood inspired by the game of golf applied. Lower bound of the criterion function was used in the search of the neighborhood.
Subject
Control and Optimization,Modeling and Simulation,Control and Systems Engineering
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献