The basic operation of a construction company involves the execution of tasks (building structures or building works) on sites. These projects are linked by the common resources of a building company used for the execution of different orders. The scheduling of a construction company programme is a continuous process with a dynamically changing look-ahead and scope of works. Decisions made on site by junior managers are based on their experience and intuition and are attempts at purposeful regulation – adaptation of the operative plan to the directive schedule, agreed with the investor, considering the progress of work. The quality of management decisions can be improved by implementing computer-based decision-supporting systems.
Subject
Electrical and Electronic Engineering,Mechanical Engineering,Aerospace Engineering,General Materials Science,Civil and Structural Engineering,Environmental Engineering
Reference18 articles.
1. Modeling contractor’s bidding decisions;Procedia Engineering,2017
2. Scheduling model of construction activity with time couplings;Journal of Civil Engineering and Management,2003
3. Designing the structure of a construction project operating system using evolutionary algorithm;Archives of Civil Engineering, LIV,2008
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献