1. [1] DODGE, F. (1943). A sampling plan for continuous production. Ann.Math.Statist.14,3,264-279.10.1214/aoms/1177731420
2. [2] OHTA, H. and KASE, S. (1984). GERT analysis of economic design of Dodges CSP - 1 Continuous sampling plan under inspection error. Frontiers in Quality Control, 2, Ed. by Lenz et al., 247-260. Physica-Verlag.
3. [3] MASON, S.J. (1953). Some properties of signal flow graphs. Proc. IRE, 41, 9, 1144-1156.
4. [4] GAURISHANKAR and MOHOPATRA, B.N. (1994); GERT analysis of dodges CSP-1 continuous sampling plan, The Indian journal of Statistics vol.56, No.3, pp 468-478
5. [5] VEERAKUMARI, K.P. and RESMI, R. (2016) ; Designing optimum plan parameters for continuous sampling plan of type (CSP-2) through GERT analysis, Journal of Statistics and Management Systems vol.19, No.2, pp 303-311.