Medical Device Regulation and current challenges for the implementation of new technologies

Author:

Kaule Sebastian1,Bock Andrea1,Dierke Ariane1,Siewert Stefan1,Schmitz Klaus-Peter12,Stiehm Michael1,Klar Ernst3,Leuchter Matthias3,Lenarz Thomas4,Zygmunt Marek5,Schmidt Wolfram2,Grabow Niels2

Affiliation:

1. Institute for Implant Technology and Biomaterials e.V., Rostock- Warnemünde , Germany

2. Institute for Biomedical Engineering, University Medical Center Rostock, Rostock , Germany

3. Department of Surgery, University Medical Center Rostock, Rostock , Germany

4. Department of Otolaryngology, Hannover Medical University, Hanover , Lower Saxony, Germany

5. Clinic and Polyclinic for Gynaecology and Obstetrics, University Medical Center Greifswald, Greifswald , Germany

Abstract

Abstract The European Parliament and the European Council on May 26, 2017 decided to introduce the new regulatory framework for medical devices. The transitional period of the so called Medical Device Regulation (EU 2017/745, MDR) should end on May 26, 2020. Currently the European Commission is working on a proposal to postpone the application for one year to relieve pressure from all stakeholders allowing them to fully focus on priorities related to the coronavirus crisis. From this date or most likely from May 26, 2021, manufacturers must present a CE-certificate according to the new MDR requirements not only for novel medical devices, but also for approved medical devices which are already on the market. The MDR will significantly complicate the process of bringing medical devices into market due to the increased requirements for the CE-certification process, particularly concerning increased documentation effort. This involves a risk for the translation of innovative products due to an overload of the overall system (manufacturers, Notified Bodies, experts) and might lead to shrinkage of the product range of existing products. Thankfully, adaption of transitional periods, special regulations, extensions of deadlines and most probably postponement of the MDR application date will ensure that there will be no gaps in medical supply that endanger patients. Establishing and keeping the relevant regulatory expertise up to date and devoting the necessary financial, time and human resources that is the biggest immediate challenge the medium-sized medical technology sector is facing in the near future. The current article, written about one month before the initially expected end of the first transition period on May 26, 2020, summarized the main aspects of the current state of MDR implementation with respect to regulatory novelties, the current legal basis in Germany, transition periods and changes in the requirements of CE-certification relevant technical documentation. Furthermore, challenges for existing and innovative medical devices were shortly discussed using a new stent based therapy of the proximal Fallopian tubal stenosis and transcatheter aortic valve implantation as two examples.

Publisher

Walter de Gruyter GmbH

Subject

Biomedical Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3