1. J. R. Sturgul, “Modelling and Simulation in Mining-Its Time Has Finally Arrived”, Simulation, Vol. 76, No. 5, pp. 286–288, 2001
2. M. S. Kizil, A. McAllister, R. Pascoe, “Simulation of Development in Longwall Coal Mines”, 11th Underground Coal Operators' Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, pp. 91–98, 2011
3. J. Greberg, F. Sundqvist, “Simulation as a tool for mine planning”, 2th International Future Mining Conference, Sydney, New South Wales, pp 273–278, 2011
4. D. Cai, E. Baafi, I. Porter, “Modelling a longwall production system using flexsim 3D simulation software”, Twenty First international symposium on Mine planning and equipment selection, New Delhi, India, pp. 107–114, 2012
5. I. Rascolean, C. Dura, “Efficient use of Production Factors in Pit Coal Extraction”, 11th WSEAS International Conference on Automatic Control, Modelling & Simulation, Stevens Point, Wisconsin, USA, pp. 140–145, 2009