Author:
Sabando-Catagua Leonardo David,Vergara-Faubla Jorge Agustín,Segarra Julio Cesar Guaman
Abstract
A simulation of a photovoltaic system connected to the grid, located in El Limón, in the Portoviejo canton, for self-consumption was carried out to reduce demand during daytime hours. The literature review was used and the PvSyst tool was used, a system with a total capacity of 3075 Wp was evaluated. Various parameters were analyzed, including energy production, system losses, and economic viability. The results indicate an annual production of 4278.52 kWh and a payback period of approximately 3 years, with an average performance of 84.10%. This study provides a detailed view of the performance and financial implications of the implementation of photovoltaic systems in this region.
Publisher
Universidad Tecnica de Manabi