1. AIA, T. A. I. O. A. (2007). Integrated project delivery: A guide. California: The American Institute of Architects. [S.l.].
2. Ansari, S., Bell, J., & CAM-I, T. C. G. (1997). Target costing: The next frontier in strategic cost management. Chicago: Irwin Professional Pub.
3. Target value design: Current benchmark;Ballard G.;Lean Construction Journal,2011
4. Ballard, G., & Reiser, P. (2004). The St. Olaf college fieldhouse project: A case study in designing to target cost. In Proceedings: International group for lean construction (pp. 1–9). Helsinki, Denmark: Lean and Integrated Project Delivery Special Issue.
5. Caixeta M. C. B. F. Fabricio M. M. & Figueiredo A. (2009). Desenvolvimento integrado de projeto gerenciamento de obra e manutenção de edifícios hospitalares. (Integrated Project development construction management and healthcare buildings maintenance - In Portuguese). Ambiente Construído Porto Alegre pp. 57–72.