1. “Facility Integrity Evaluation Review Committee for the Seawater Inflow Event at Unit 5 of the Electric Power Plant ” Press Release No. 1 and Hamaoka Nuclear Power Plant Document 2-1 Chubu Electric Power Co. (Sep. 9 2011); https://www.chuden.co.jp/energy/nuclear/hamaoka/hama_info/hama_info_detail/__icsFiles/afieldfile/2020/02/09/hyoukakentouiinkaigiji.pdf (accessed Jan. 7 2024).
2. “Facility Integrity Evaluation Review Committee for the Seawater Inflow Event at Unit 5 of the Electric Power Plant ” Press Release No. 3 and Hamaoka Nuclear Power Plant Document 4-3 Chubu Electric Power Co. (Nov. 12 2012); https://www.chuden.co.jp/energy/nuclear/hamaoka/hama_info/hama_info_detail/__icsFiles/afieldfile/2020/02/07/241112kenzenseihyoukakenntouiinnkai.pdf (accessed Jan. 7 2024).
3. “Hamaoka Nuclear Power Station No. 5 Cause and Countermeasures for Corrosion Hole in Lining of Condensate Storage Tank ” Press Release Attachment Chubu Electric Power Co. (May 28 2012); https://www.chuden.co.jp/publicity/press/3186776_6926.html (current as of Jan. 7 2024).
4. H. YUYA et al., “Hamaoka Unit 5 Seawater Contamination at Chubu Electric Power Co. Elucidation of Corrosion Mechanism of Pipes Weld Metal with Corrosion,” presented abstract at the Japan Society of Maintenology, 17th Annual Mtg.
5. “Equipment Integrity Evaluation Review Committee for Seawater Inflow Event at Power Plant Unit No. 5 ” Press Release No. 11 Hamaoka Nuclear Power Plant Document 3 Chubu Electric Power Co. (June 29 2018); https://www.chuden.co.jp/resource/ham/300629_5ukaisuihyouka.pdf (accessed Jan. 7 2024).