Subject
Management of Technology and Innovation,Information Systems and Management,Management Science and Operations Research,Industrial relations,Business and International Management
Reference19 articles.
1. Aven, T. (1987). A counting process approach to replacement models.Optimization,285–296.
2. Badía, F. G., Berrade, M. D. and Campos, C. A. (2001). Optimization of inspection intervals based on cost.Journal of Applied Probability, 872–881.
3. Barlow, R. E., Hunter, L. C. and Proschan, F. (1963). Optimum checking procedures.Journal of Society for Industrial and Applied Mathematics, 1078–1095.
4. Barlow, R. E. and Campo, R. (1975). Total time on test processes and applications to failure data analysis. InReliability and Fault Tree Analysis(Edited by R. E. Barlow, J. Fussell and N. D. Singpurwalla), 451–481. SIAM, Philadelphia.
5. Bergman, B. and Klefsjö, B. (1984). The total time on test concept and its use in reliability theory.Operations Research, 596–606.