1. Allen, D. (2003). Probabilities associated with a Built-in-Test system, focus on false alarms.Proceedings of AUTOTESTCON, IEEE Systems Readiness Technology Conference,22–25,643 – 645.
2. Anderson, N. and Wilcoxon, R. (2004). Framework for prognostics of electronic systems,Proceedings of International Military and Aerospace/Avionics COTS Conference,Seattle, WA, August 3–5.
3. Anzai, H. (1991). Algorithm of Rainflow Method. The Rainflow Method in Fatigue,Butterworth-Heinmann, Oxford, 11–20.
4. Bodenhoefer, K. (2004). Environmental life cycle information management and acquisition — first experiences and results from field trials.Proceedings of Electronics Goes Green 2004+, Berlin, 541–546.
5. Gross, K. (2005).Continuous System Telemetry Harness.Sun Labs Open House, 2004, research.sun.com/sunlabsday/docs.2004/talks/1.03_Gross.pdf.