Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Strategy and Management
Reference11 articles.
1. Performance of Lot-Sizing Rules in an MRP System with Different Operating Conditions
2. COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING
3. MCLAREN , B. J. , May 1977 , A study of multiple level lot sizing procedures for material requirements planning systems , Ph.D. dissertation, School of Management , Purdue University ( unpublished ).
Cited by
33 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献