1. Anand, Nikhil, Akhil Gupta, and Appel Hannah, eds. 2018. The Promise of Infrastructure. Durham: Duke University Press.
2. Bankwatch Network. 2021. “ Connecting or Dividing? The South Mostar section of Corridor Vc in Bosnia and Herzegovina .” January 26. https://bankwatch.org/publication/connecting-or-dividing-the-south-mostar-section-of-corridor-vc-in-bosnia-and-herzegovina
3. Bankwatch Network. 2022. “Open Letter to the EBRD and JP Autoceste About the Legality of the Project-Level Spatial Plan of 2017 for the Corridor Vc in the Hercegovina-Neretva Canton.” CEE Bankwatch Network February 16. https://bankwatch.org/wp-content/uploads/2022/02/Open-letter-to-EBRD-and-JP-Autoceste_NM-consultation-16-0222.pdf
4. Politicizing hydroelectric power plants in Portugal: spatio-temporal injustices and psychosocial impacts of renewable energy colonialism in the Global North
5. Time as Technique;Bear Laura.;Annual Review of Anthropology,2016