Subject
Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems
Reference9 articles.
1. Arditi, D. Problems in the process of introducing network analysis. CIB Proceedings of the Fifth International Congress. Haifa.
2. The use of integer linear programming for modelling project control information
3. Optimization of time and cost
4. Cusack, M. M. and Richardson, D. (1984) Time cost trade off for project networks: integer linear programming versus heuristics, internal paper, Bristol Polytechnic.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献