1. Ashley, D. B. and Tiecholz, P. M. (1977) Pre-estimate cash flow analysis. Journal of the Construction Division, ASCE, Proc. Paper 13213, 103 (CO3): 369–379. See also discussion by Gates, M. and Scarpa, A. (1978), 1 (CO1): 111–113, and closure by Ashley et al. (1978), 104 (CO4): 554.
2. Balkau, B. J. A financial model for public works programmes. Paper to national ASOR conference. August25–27, Sydney.
3. Berdicevsky, S. (1978) Erection cost flow analysis. MSc Thesis, Technion, Israel Institute of Technology, Haifa, Israel.