1. The value of integrated tactical planning optimization in the lumber supply chain
2. Ben Ali, Maha, Jonathan Gaudreault, Sophie D'Amours, and Marc-André Carle. 2014. “A Multi-Level Framework for Demand Fulfillment in a Make-to-Stock Environment—A Case Study in Canadian Softwood Lumber Industry.” In MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation, 5–7 November 2014, Nancy, France. https://hal.archives-ouvertes.fr/hal-01166600/.
3. The effect of flexible lead times on a paper producer
4. Fronius, Karl. 1989. Arbeiten und Anlagen im Sägewerk. Bd. 2. Spaner Kreissägen Bandsägen [Operations and Machines at the Sawmill. Vol. 2. Profiler Circular Saws Band Saws]. Leinfelden-Echterdingen, Germany: DRW-Verlag.
5. Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry