Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost
Author:
Publisher
Informa UK Limited
Subject
Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems
Link
http://www.tandfonline.com/doi/pdf/10.1080/01446190802036128
Reference27 articles.
1. Fuzzy Multiple Attribute Decision Making
2. A MODEL FOR CONSTRUCTION PROJECT BUDGET AND SCHEDULE PERFORMANCES USING FUZZY DATA
3. Optimal Probabilistic Compression of PERT Networks
4. Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems
5. Stochastic Construction Time-Cost Trade-Off Analysis
Cited by 52 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management;International Journal of Construction Management;2024-09-04
2. Augmented Time–Cost Trade-Off Optimization Using Particle Swarm Optimization;Journal of Construction Engineering and Management;2024-05
3. Solving time cost optimization problem with adaptive multi-verse optimizer;OPSEARCH;2024-01-24
4. Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff;Journal of Engineering Research;2023-11
5. CO2 pollution reduction: a tradeoff for fully fuzzy parameters in a megaproject optimization;Engineering Computations;2023-09-27
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3