Heuristic method for multi‐project finance‐based scheduling
Author:
Publisher
Informa UK Limited
Subject
Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems
Link
http://www.tandfonline.com/doi/pdf/10.1080/01446190802673110
Reference16 articles.
1. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
2. Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
3. Finance-Based Scheduling of Construction Projects Using Integer Programming
Cited by 49 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A bi-objective optimization for finance-based and resource-constrained robust project scheduling;Expert Systems with Applications;2023-11
2. Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty;European Journal of Operational Research;2023-10
3. Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns;Annals of Operations Research;2023-09-28
4. Development of a Financing Optimization Framework Based on Risk Simulation in BOT Projects: A Case Study of the Waste-to-Energy Project;Complexity;2023-08-22
5. Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects;Asian Journal of Civil Engineering;2023-04-05
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3