1. M. C. Hall and D. A. Hodges, 1976, "Experience with 500KV subsynchronous resonance and resulting turbine generator shaft damage at Mohave generation station," IEEE Publication 76 CH1066-0-PWR, IEEE, New York, pp. 22-29.
2. T. J. Hammons, 1987, "Effects of three-phase system faults and faulty synchronization of the mechanical stressing of large turbine generators," Revue Generale de l'Electricite, Tome 86, No. 7-8, 1977, pp. 558-580; Discussion, Tome 87, No. 6, pp. 489-500.
3. Modelling and analysis guidelines for slow transients. Part I. Torsional oscillations; transient torques; turbine blade vibrations; fast bus transfer
4. Effects of Switching Network Disturbances on Turbine-Generator Shaft Systems
5. Stochastic evaluation of turbine-generator shaft torsional torques during faulty synchronisation